Hardy Mill CP School
We provided a access lift with triple hand rail edge protection with working platforms and gantry walk ways with full debris netting and brick guards for full roof replacement.
Raines House
We provided a designed scaffold to the full circumference off Raines house for structural work with a extra two stories to be added to at a later date.
Bradford Grammar School
Independent scaffolding for the building for brickwork work restoration that needed to comply with all the health and safety regulations including pedestrian walkway full debris netting.
Burleigh Medical Centre, Barnsley
NHS newbuild medical centre located in South Yorkshire. We provided progressive independent scaffold to the newbuild project, ensuring we kept to the strict site timescales for the 12-week plan. • Handrail system • Netting • Loading Bay
Peel Street, Marsden
A local community Co-Op underwent a complete refurbishment. We provided specialist scaffolding design to overcome challenges due to the narrow streets and also ensured loading bay access for deliveries was left unrestricted. • Bridge & beam • Rubbish shoots • Landing area
Barker Street, Oldham
Tasked with providing access for a major roofing refurbishment on 11 medium rise residential blocks. We ensured unrestricted resident access at all times and performed regular scafftag checks to further guarantee resident safety. • Haki staircase • Rubber shoots • Loading bays • Handrailing • Independent scaffolding • Special fixings and brackets for the render…